2006. - Manufacture a dosing device.
2007г. - Replacement of the controller, installation of electrical circuits and commissioning of the HUBER plugs washing machine
2011г. - Installation of pipelines PW, WFI, CS, product pipelines according to the project, laying of energy supply pipelines to the equipment and its connection
2011 - Manufacturing and installation of the service area
2011 - Development of project documentation for the "Conceptual design" stage of the distribution system for clean media PW, WFI, CS, and technological pipelines, including piping solutions for the preparation of solutions for the production of infusion solutions
2012г. - Development of project documentation for the "Conceptual design" systems of the PW, WFI, CS clean media distribution system and process pipelines, including piping solutions for the preparation of hormonal preparations, as per the terms of reference.
2013. - Installation of pipelines for the distribution of clean media PW, WFI, CS and process pipelines, including piping solutions for the preparation of hormonal preparations, as per the terms of reference.
2014. - Installation of a distribution system for clean media PW, WFI, CS, process pipelines and product pipelines for the preparation of solutions